Blogs

New Space Update 8: New Door

🇬🇧 · Leeds Hackspace · adnbr

Remember we picked up a new door a couple of weeks ago? This weekend we fitted it. Replacing the door was quite an important part of preparing to move into the new premises – the old door was not only falling apart and as a double leaf door it was going to be either difficult or expensive to secure in a reliable, electronically controllable way. Removing the old door was a challenge. Old bricks meant a lot of bolts spun in their anchors and some sections of the old grating had their nuts welded on to the screw thread. We broke out the grinder. If in doubt, don’t buy a cordless grinder. Just go with the mains. It’s cheaper and probably a lot more effective. You won’t spend half your life running back and forth between job site and battery charger, that’s for sure. While putting up cable conduit we unfortunately dropped a drill down the back of one of the pre-existing false walls so we had to buzz open a drill-sized hole in the wall with a jigsaw to retrieve it. A quick patch up and covering with some filler was all that was required. Tim, Samson and Tom continued with the e

Blog